Roofer network donates materials to top off ‘church in a week’ project

Image: Pastor Preston Dixon and the 3C Network partner to bring a roof to the new church.

Pastor Preston Dixon and the 3C Network partner to bring a roof to the new church. (Anne Sutherland)

Image: Pastor Dixon welcomes Toby  Collins to the new sanctuary.

Pastor Dixon welcomes Toby Collins to the new sanctuary. (Anne Sutherland)

Image: The new roof was donated by 3C Network, a partnership of contractors.

The new roof was donated by 3C Network, a partnership of contractors. (Anne Sutherland)

Image: Pastor Dixon shows off the foyer area, which will be decorated beautifully for the King of Kings.

Pastor Dixon shows off the foyer area, which will be decorated beautifully for the King of Kings. (Anne Sutherland)

Image: Long time member, Christopher Speed, and newcomer, Darrell Swanson, look over the plans for the new church.

Long time member, Christopher Speed, and newcomer, Darrell Swanson, look over the plans for the new church. (Anne Sutherland)

Image: Soon to be a beautiful place of worship.

Soon to be a beautiful place of worship. (Anne Sutherland)

Image: Church members of Mt. Gilead help with some of the labor.

Church members of Mt. Gilead help with some of the labor. (Anne Sutherland)

Image: The builders wrote special verses on the lumber and will always be there, even when the sheet rock is placed.

The builders wrote special verses on the lumber and will always be there, even when the sheet rock is placed. (Anne Sutherland)

Image: Pastor Dixon invites everyone to visit the new church.  “We built this church on the Word of God.  We laid a bible under the foundation near the pulpit before the slab was poured,” the pastor was proud to say.  All are welcome.

Pastor Dixon invites everyone to visit the new church. “We built this church on the Word of God. We laid a bible under the foundation near the pulpit before the slab was poured,” the pastor was proud to say. All are welcome. (Anne Sutherland)

Return to story